Zhejiang Zetastone Wire & Cable Co., Ltd.
PVC Insulated Sheathed Copper Single Core Power Electric Wire Cable

Single Core
PVC Insulated Sheathed Copper Single Core Power Electric Wire Cable

PVC Insulated Sheathed Copper single Core Power Electric Wire Cable

Get Price now

PVC Insulated Sheathed Copper single Core Power Electric Wire Cable Scope

(1)Rated temperature: 150ºC
(2)Rated voltage: 600V
(3)Passes FT2 vertical flame test.


PVC Insulated Sheathed Copper single Core Power Electric Wire Cable Construction

(1)Conductor:bare copper

(2)Insulation:PVC

(3)Sheathe:PVC

(4)Products parameter:


Conductor

Insulation

Max. Cond Resistance at 20°C
(Ω/km)

AWG

Construction
(No./mm)

Diameter
(mm)

Thickness
(mm)

Diameter
(mm)

30

7/0.10

0.30

0.42

1.14

381

28

7/0.127

0.38

0.41

1.20

239

26

7/0.16

0.48

0.41

1.30

150

24

7/0.20

0.60

0.42

1.44

94.2

22

17/0.16

0.76

0.42

1.60

59.4

20

26/0.16

0.94

0.42

1.78

36.7

18

41/0.16

1.18

0.41

2.00

23.2

16

26/0.254

1.49

0.42

2.32

14.6


(5)Reference Standard: UL758, UL1581, CSA22.2


PVC Insulated Sheathed Copper single Core Power Electric Wire Cable Application

(1) Internal Wiring of Appliances

(2) For internal wiring of electronic and electrical equipment and appliance.

 

PVC Insulated Sheathed Copper single Core Power Electric Wire Cable FAQ

Q1.ABOUT US?

A1: Zhejiang Yuantong Wire & Cable Manufacturing Co., Ltd. is one of the enterprises of the high-end manufacturing sector of the Fortune Global 500 - Wuchan Zhongda Group(WZ Group) (stock code SH600704). It was Founded in 2000 with a registered capital of RMB 800 million, we are a leading technology company in China that produces the most complete varieties of Bare conductor & Power Cable & Fire-proof cable & UL & CSA List cables.

 

Q2:how about your quality?

A2: We have built a provincial "factory of the future" and have the largest single and most efficient special cable intelligent production workshop in Asia. There are advanced production equipment and skilled workers, as well as mature testing equipment.

 

Q3:how about your price?

A3: Due to our scale and high degree of automation, we can reduce labor costs and procurement costs, so our prices are very competitive in the cable industry

 

Q4:how about your delivery time?

A4: We have spare core, so our production time can be compressed to 7 days.If your order is large,please consult our sales staff for specific production time

 

Q5: can your offer sample service?

A5:we can provide free samples,but the shipping cost need be charged by you.

 


Have a question?
Have a question?
Email us with any questions or inquiries or use our contact data. We would be happy to answer your questions